We – EPG Team the largest gearbox & motors , couplings and gears factory in China with 5 different branches. For a lot more particulars: Cell/whatsapp/telegram/Kakao us at: 0086~thirteen 571 88828 13858117778 571 88828
F sequence Parallel Shaft-Helical Geared Motor Characteristics
one.Features:
- High effectiveness: ninety two%-ninety four%
- Parallel output, compact framework, huge output torque, smooth procedure, low noise and extended services lifestyle.
- Large precision: the equipment is produced of large-high quality alloy steel forging, carbonitriding and hardening remedy, grinding method to make certain high precision and steady managing.
- Higher interchangeability: hugely modular, serial design, powerful flexibility and interchangeability.
2. Technological parameters
Ratio | 3.77-276.77 |
Enter electricity | .12-200KW |
Output torque | 3.5-21700N.m |
Output pace | five-352rpm |
Mounting type | Foot mounted, foot mounted with reliable shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Input Approach | Flange enter(AM), shaft input(Ad), inline AC motor input, or AQA servo motor |
Brake Launch | HF-manual launch(lock in the brake release situation), HR-manual launch(autom-atic braking situation) |
Thermistor | TF(Thermistor defense PTC thermisto) TH(Thermistor protection Bimetal swotch) |
Mounting Placement | M1, M2, M3, M4, M5, M6 |
Variety | F37-F157 |
Output shaft dis. | 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
Housing content | HT200 high-strength cast iron from R37,47,57,sixty seven,77,87 |
Housing material | HT250 Higher toughness solid iron from R97 107,137,147, 157,167,187 |
Warmth treatment technology | carbonitriding and hardening treatment method |
Efficiency | 92%-ninety four% |
Lubricant | VG220 |
Safety Class | IP55, F class |
Starshine Drive
ZheJiang Starshine Push Co.,Ltd,the predecessor was a condition-owned armed forces mould business, was proven in 1965. Starshine specializes in the total electrical power transmission resolution for high-finish gear producing industries based on the intention of “System Solution, Application Layout and Expert Support”.
Starshine have a strong technical pressure with over 350 workers at current, including over 30 engineering professionals, 30 good quality inspectors, covering an spot of 80000 square meters and kinds of sophisticated processing devices and tests equipments. We have a great foundation for the business software growth and support of higher-end velocity reducers & variators proudly owning to the provincial engineering technology analysis centre,the lab of equipment speed reducers, and the foundation of present day R&D.
Our Group
High quality Manage
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
solution is a product inspection to determine the qualified products.
7. Certification.
All our products get ISO & CE & UL certification.
Packing
Shipping
The use of authentic tools manufacturer’s (OEM) component figures or emblems , e.g. CASE® and John Deere® are for reference functions only and for indicating merchandise use and compatibility. Our company and the listed substitute parts contained herein are not sponsored, authorized, or made by the OEM.