We – EPG Group the most significant gearbox & motors , couplings and gears manufacturing facility in China with 5 distinct branches. For much more information: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828
Founded in 1992, HangZhou Lanhang Machinery Co., Ltd. is a personal enterprise integrating scientific study, manufacturing, marketing and provider of plastic machinery into 1 complete complete. Soon after 10 years of tough function and ongoing efforts to improve item high quality, we passed ISO9001 certification for our goods.
Our “Lanhang” brand name of planetary roll extruders, straining extruders, strong horsepower dense mixers, mixing rolls, and large-speed mixers are the spine of our organization.
Solution Description
one) Application
Used for plastic plasticizing, calendering and urgent.
2)Main techinical parameter
ProjectModel | SK400*1000 | SK450*1200 | SK560*1830 | SK610*2030 | SK660*2300 | SK760*2800 |
Entrance/back again roll diameter(mm) | 400 | 450 | 560 | 610 | 660 | 760 |
Wor ept size(mm) | one thousand | 1200 | 1830 | 2030 | 2300 | 2800 |
Major motor electrical power(kw) | forty five | 55 | 75 | ninety | 132 | 220 |
Reucer pace box | Hard toothed | |||||
Type of generate | Cardan shaft |
3) machine listing
No. | Merchandise | Quantity |
1 | Roller | 2 pc |
2 | Temperature controlling device | 2 set |
3 | Machine bed | 1 set |
4 | Nip adjusting device | 1 set |
five | Blocking device | 1 set |
6 | Cutting device | 1 set |
7 | Stock pan | 1 set |
eight | Speed reducer | 1 set |
nine | Reducer lubricating system | 2 set |
ten | Emergency brake, safety device | 2 set |
11 | Control system | 1 set |
twelve | Main motor | 2 set |
Packaging & Delivery
1. Payment: 30% by T/T as down payment money, balance (70%) by T/T before shipment.
2. Lead Time: 90 working days after receiving the down payment money.
3. Package: PE film, pallet at the bottom (if necessary).
Our Services
one. Warranty period: From the day of the use of the machine in the buyer’s factory:
(1) The mechanical Parts: 12 months
(2)The electrical Parts: 6 months
2. Installations and Commissioning
(1)Up to date commissioning has been made before shipment
(2)Overseas Commissioning and charges:
0ne or two technicians will be sent to the buyer to guide the installation and commissioning of thequipment if the customer requests.
Customers pay the charge of our technicians.
1) Round-trip Airplane Tickets
2) Charges of transportation, accommodation and communication
3) The allowance of the technicians is USD 100 per day for one person.
4) An interpreter is needed.
3 English manual, Figuration drawing, and footing drawings are provided
The use of original gear manufacturer’s (OEM) part quantities or trademarks , e.g. CASE® and John Deere® are for reference functions only and for indicating product use and compatibility. Our business and the outlined substitute areas contained herein are not sponsored, accepted, or created by the OEM.